Pennsylvania makes power. That changes what your ground competes on.

We purchase and option Pennsylvania land for data center development. In most states the question is whether a line reaches you. Here it is often whether you are near where the electricity is generated.

See if your land qualifies

No cost, no obligation, and no pressure. We answer either way.

See if your land qualifies

Tell us about your property. There is no cost and no obligation. If it does not fit, we will tell you plainly.

A rough number is fine. If you are not sure, write not sure.

Does the property have electric service now?
Is there anything like this nearby that you know of?Check any that apply. Guessing is fine.
Are you the one who decides whether to sell?
Where are you in your thinking?

We use this only to evaluate your property and to contact you. We do not sell your information.

Who you are dealing with

We are the buyer, not a middleman

Old industrial ground is an asset here, not a liability

The largest project in this state is being built on a retired coal fired power station in Indiana County, because what a closed plant leaves behind is exactly what a data center needs: interconnection, water, road and rail, and a community familiar with heavy industry. Pennsylvania has a good deal of ground in that category.

Smaller counties clear a lower bar

Pennsylvania keys its exemption to county population. Below 250,000 people a project needs 75 million dollars and 25 jobs. Above that it is 100 million and 45. So the rural half of this state is not the harder place to make a project work, it is the easier one.

We are the buyer and we tell you when it is no

We sit across the table from you rather than beside you, and we would rather say that at the outset. Take anything we send to your own attorney. Most Pennsylvania ground we look at will not work, and when that is the answer you will get it plainly.

How it works

Four steps, and we do most of the work

  1. You tell us about the land

    Send us the county, roughly the acreage, and what you have noticed around the place. Mention any gas well, pipeline, or old industrial site nearby. Where you are not certain, say so rather than guessing.

  2. We check it against public records

    We look up who serves you, what transmission and generation sit near, and what the county has already done with projects of this kind. Almost all of it is public record and it costs you nothing.

  3. We call you if it looks workable

    Where it looks promising you get our actual reasoning rather than a summary of it. Where it does not, you get the specific thing that rules it out, because being told your ground sits four miles from the nearest substation with capacity is worth something, and being told it is not a fit is worth nothing at all.

  4. We make an offer, or we tell you why not

    Documents come at the end. Your attorney reads anything before you act on it, and up to that point we have asked you for nothing beyond a description of your place.

Read more about the process

Pennsylvania

Selling land for a data center in Pennsylvania

Pennsylvania is a generating state rather than an importing one, and that changes the question a landowner should be asking. Elsewhere the test is distance to transmission. Here, proximity to generation matters in its own right, because projects have been built around existing power stations, retired plants, and gas supply rather than around a line running past a field. So we want to know your county, roughly the acreage, what runs near you, and whether there is any gas infrastructure or a former industrial site nearby. Send that over and we will check it against public records at no cost, and tell you either way.

More about Pennsylvania

Not sure if your land is worth asking about?

Ask anyway. Checking costs you nothing, and the properties that turn out to work are often ones the owner assumed were ordinary.

See if your land qualifies